Monolithic Slab

 

Monolithic Foundation

This foundation is when the slab and the footings are poured all at the same time.  It saves some time as all the concrete is poured at once.  It does make layout of the internal plumbing and other items that come out of the slab more difficult to place.  There is also the concern that even with exterior slab insulation there is still heat loss through the bottom of the slab.  This type of foundation cannot be used with radiant floor heating.

Advance Concept Group and its affiliates use multiple forms of communication to communicate with clients.  This includes email, text, voice, and fax.  We only communicate with known clients, managers, or tenants of clients, that we have been given their contact information. We do not spam unknown numbers.  If you have received communication from us that is not valid, please respond back via the method of communication with “STOP” and we will remove the email or number from our system,  We attempt to keep all methods current but understand that ownership, tenants and managers change and we are not always given the most current information.  We do not sell information.